For this particular project, I was working with the masonry trade and was responsible for the preparation of construction drawings for 19 wet rooms.
The scope of the work among other things included:
- Analyzing and upgrading wet room designs to comply with building regulations.
- “Rebuilding” the sanitary sewage line at Solbakken 31-33.
- Address both structural and environmental aspects of the sewage system.
- Develop detailed models (3D) and technical drawings for masonry work.
- Address specific requirements of social housing, balancing practicality with aesthetic considerations.
- Collaborate with peers from different trades, gaining insights into the interdisciplinary nature of construction projects.
- Apply problem-solving skills to address unexpected issues during the project, particularly in the sewage line rebuilding.
- Demonstrated adaptability and resourcefulness in finding effective solutions.
Grade: 12